Home / Projects / Noden Causeway

Noden Causeway pile rehabilitation

Client
Ministry of Transportation of Ontario
Location
Rainy Lake, Fort Frances
Year
2009–2014
Services
Marine construction, barge rentals

In 2005, the Ministry of Transportation of Ontario found that the 1,113 steel pipe piles supporting the Noden Causeway across Rainy Lake had been affected by microbiologically influenced corrosion (MIC), causing significant steel section loss. After reviewing the options, the MTO chose polymer pile encapsulation as the repair method.

In 2009, we were the successful contractor on a 12-pile trial under the west low-level structure. With the trial a success, we were awarded the contract for the rest of the 200 piles under the west low-level structure and completed it in the fall of 2009.

In 2010, we were awarded the contract for the 856 piles under the high-level structure. The work was completed one year ahead of its three-year schedule.

We carried out the work from our barges, using a custom work platform we built for the job.

With the most severely affected 12 ft sections repaired, the MTO moved on to the slower-progressing sections below, extending the repair from the bottom of the original encapsulation down to the mudline.

Gallery