Home / Projects

Projects

Work for provincial, municipal, First Nation and industrial clients across Northwestern Ontario and beyond.

  1. 2026

    Fort Frances shoreline protection

    Placement of rip rap along the Fort Frances waterfront, from the water treatment plant to the Sorting Gap Marina, to protect the shoreline against erosion and wave action.

    View project →
    Town of Fort FrancesWater treatment plant to Sorting Gap Marina
  2. 2025–2026

    Stormwater management and drainage upgrades

    Community-wide drainage improvements, including road regrading, ditch clearing and reshaping, culvert replacement and upsizing, and topsoil and hydroseeding restoration. The work reduces flooding in the community and improves the quality of stormwater runoff entering Rainy Lake.

    View project →
    Couchiching First NationNear Fort Frances
  3. 2023–2024

    Site remediation, Phases 2B, 2C and 3

    Excavation of contaminated soil and debris from former industrial lands on the Rainy Lake shoreline, previously used for sawmill, wood treatment and other industrial operations, and hauling of the material for off-site disposal.

    Couchiching First NationRainy Lake shoreline
  4. 2023

    Sinclair Avenue reconstruction

    Full reconstruction of Sinclair Avenue, the street behind La Verendrye General Hospital, including sewer and watermain replacement, new curb and sidewalk, and asphalt paving. Access to the hospital was maintained throughout construction.

    Town of Fort FrancesBehind La Verendrye General Hospital, Fort Frances
  5. 2021–2022

    Kings Highway widening and storm sewer improvements

    Widening of Kings Highway with storm sewer improvements, delivered in two stages over the 2021 and 2022 construction seasons.

    View project →
    Town of Fort FrancesFort Frances
  6. 2009–2014

    Noden Causeway pile rehabilitation

    Polymer encapsulation of corroded steel pipe piles under the Noden Causeway for the MTO, working from our barges and a custom-built work platform, from a 12-pile trial in 2009 through 856 piles under the high-level structure, completed one year ahead of schedule.

    View project →
    Ministry of Transportation of OntarioRainy Lake, Fort Frances
  7. 2009

    Hallett tug relocation

    Relocation of the Hallett tug from Pither’s Point Park to the Sorting Gap Marina, including road transport, launching and towing.

    View project →
    Town of Fort FrancesFort Frances
  8. 2006

    Firebag aggregate crushing

    Crushing of 1.5 million tonnes of granular material for the Stage 3 expansion of the Firebag oil sands project.

    Suncor Energy130 km north of Fort McMurray, AB
  9. 2004

    Sioux Narrows Bridge removal

    Staged removal of the Sioux Narrows Bridge on Highway 71, using a 400-ton jacking system mounted on our barges to support the structure during disassembly.

    Ministry of Transportation of OntarioHighway 71, Sioux Narrows
  10. 2002

    La Verendrye Parkway

    Development of the Rainy River waterfront in Fort Frances, from the hospital to the far side of Pither’s Point.

    View project →
    Town of Fort FrancesFort Frances
  11. Sawbill Creek floating bridge

    Abitibi-Bowater, the local pulp and paper company, needed winter access to timber across Sawbill Creek over five seasons. We built a floating bridge from our Flexi-Float barges that could be installed or removed in a single day, needed very little maintenance and left minimal disturbance to the creek.

    Abitibi-BowaterSawbill Creek