Home / Projects
Projects
Work for provincial, municipal, First Nation and industrial clients across Northwestern Ontario and beyond.
-
2026
Fort Frances shoreline protection
Placement of rip rap along the Fort Frances waterfront, from the water treatment plant to the Sorting Gap Marina, to protect the shoreline against erosion and wave action.
View project → -
2025–2026
Stormwater management and drainage upgrades
Community-wide drainage improvements, including road regrading, ditch clearing and reshaping, culvert replacement and upsizing, and topsoil and hydroseeding restoration. The work reduces flooding in the community and improves the quality of stormwater runoff entering Rainy Lake.
View project → -
2023–2024
Site remediation, Phases 2B, 2C and 3
Excavation of contaminated soil and debris from former industrial lands on the Rainy Lake shoreline, previously used for sawmill, wood treatment and other industrial operations, and hauling of the material for off-site disposal.
-
2023
Sinclair Avenue reconstruction
Full reconstruction of Sinclair Avenue, the street behind La Verendrye General Hospital, including sewer and watermain replacement, new curb and sidewalk, and asphalt paving. Access to the hospital was maintained throughout construction.
-
2021–2022
Kings Highway widening and storm sewer improvements
Widening of Kings Highway with storm sewer improvements, delivered in two stages over the 2021 and 2022 construction seasons.
View project → -
2009–2014
Noden Causeway pile rehabilitation
Polymer encapsulation of corroded steel pipe piles under the Noden Causeway for the MTO, working from our barges and a custom-built work platform, from a 12-pile trial in 2009 through 856 piles under the high-level structure, completed one year ahead of schedule.
View project → -
2009
Hallett tug relocation
Relocation of the Hallett tug from Pither’s Point Park to the Sorting Gap Marina, including road transport, launching and towing.
View project → -
2006
Firebag aggregate crushing
Crushing of 1.5 million tonnes of granular material for the Stage 3 expansion of the Firebag oil sands project.
-
2004
Sioux Narrows Bridge removal
Staged removal of the Sioux Narrows Bridge on Highway 71, using a 400-ton jacking system mounted on our barges to support the structure during disassembly.
-
2002
La Verendrye Parkway
Development of the Rainy River waterfront in Fort Frances, from the hospital to the far side of Pither’s Point.
View project → -
Sawbill Creek floating bridge
Abitibi-Bowater, the local pulp and paper company, needed winter access to timber across Sawbill Creek over five seasons. We built a floating bridge from our Flexi-Float barges that could be installed or removed in a single day, needed very little maintenance and left minimal disturbance to the creek.